FENIX Turn Key SiteThe plant can be incrementally expandable from one mega watt to fifty mega watts. In the picture below the input is:
6 X 4.4t/h sewage sludge and the output is 3700 kW electrical power and 250l/h ethanol.
|
Key Sizing
- Based on application and needs in local area
- Permanent or portable depending upon need(s)
- Designed, Built and operated to fit your needs.
- What do you need?
Key Advantages
- Decentralization of plants
- System can be easily scaled and optimized based on feedstock
- High value products can be produced (energy, ethanol, Butanediol, solids, more)
- What do you want?
|